Sunday 06 July 2014
– Todmorden, Rochdale Canal
Locks were open at 07:10 so we were ready to go through the last uphill
lock and across the summit then start the run down into Yorkshire. There are a
couple of swing bridges, a narrow lock and a guillotine gate to contend with
but the weather has been great and there has been a lot of cyclists around
(ones not in that race thing). A couple
of the pounds are higher than the locks they supply so that the top gate is
part under water and there is a major waterfall once the lock is empty (needing
care to ensure that the boat is not filled). We moored up at 14:15 although all the visitor
moorings were taken then spent the rest just sitting in the sun. We have done nineteen locks and four miles
but without a proper OS map I could not say what the vertical climb either up
to the summit or down to here has been although the water has been level all
the way.